Internship · City of Montréal

Cross-Connection Detection

When a building is connected incorrectly, its wastewater flows into the storm sewer and on to local waterways. I designed the system that lets City crews detect these faults themselves, more safely and hygienically.

Role
Sole designer, from research to testing
Context
Water Department, City of Montréal
Year
2026
Tools
FreeCAD, SolidWorks, 3D printing, laser fusion
Tens of thousands of dollarssaved by the City every year by relying less on outside inspection firms.
Loading 3D model
Cross-Connection Detection
Two modules, 33 partsDrag to rotate · hover a part
01 · Starting pointFully disassembled

A camera module and a UV lamp module, each on its own base.

02 · StructureOne tube carries it all

Batteries, electronics and the door fit into a single body.

03 · FasteningRepairable, no glue

Pins, screws and threaded inserts keep everything serviceable.

04 · Field-readyThe UV lamp turns on

It reveals the fluorescent tracer while the camera records.

From the field to a concept

I started by joining technicians on inspection days, then drove through every borough to document manhole types and dimensions.

My biggest challenge was finding cameras and UV lamps small enough. I adapted the design around the components actually available.

  • Research on detection methods and Québec standards
  • Several concepts presented to the team and evaluated
  • Selection and integration of all electronics
3D-printed prototypes, before the move to metal.
3D-printed prototypes, before the move to metal.

Built, then validated

After plastic prototypes, the final parts were laser-fusion printed in metal. I soldered the electronics, assembled the system and tuned it during real-world trials.

  • Biodegradable plastic for prototypes
  • Non-toxic tracers
  • Modular design that makes repairs easier
Metal-printed version with the battery pack visible.
Metal-printed version with the battery pack visible.

Designed to outlast my internship

I delivered the documentation anyone needs to operate, repair or reproduce the system: user guide, inspection protocol, settings guide and assembly guide.

  • Built on my Capstone Project III (110 h)
  • Large-scale rollout targeted for 2027
Test image inside a manhole: the tracer stands out clearly from the background.